Sunset Valley Railroad


Sunset Valley Railroad

 

 

Instructions for assembling switch kits

 

 

1)       Start by spreading the plan on a piece of softboard on a flat workbench, and pin it at the corners. Using double faced tape, position the ties per the plan. Then place all the parts in their correct locations, making sure everything fits in place and the tops of the ties are flat. Remove all the pieces.

2)       Place the straight stock rail in the correct position, drill a hole and spike either side of the rail at each end. This secures the rail. It helps to drill at a slight inward angle. Continue drilling and spiking the stock rail to the rest of the ties.

3)       Now position and spike the tail rail and straight closure rail, with the frog, using a track gauge. Make sure the rails fit to the frog snugly. Spike up to the hinge, do not spike the points!

4)       Next, spike in the curved stock rail in the same manner. Follow with the short straight section before the bend, using the track gauge. Then fit the bent closure rail to the frog and spike to the hinge. Finally spike in the other tail rail and wing rails, again, using the gauge.

5)       Remove the switch from the softboard and turn over. Drill tapping and clearance holes in the ties and screw in the 3 frog screws. Bend over all the spikes against the underside of the ties. Turn the switch over again and install the drawbar with the screws provided, leaving a small clearance so the points move freely.  

 

 

 

Prices subject to change
 Revised: Jan-10
 
 
©2001-2009 Sunset Valley Railroad, all rights reserved.
Content Master:
Graham Comley